CAC Gas & Instrumentation

Pulp & Paper

Gas references for mill processes and monitoring.

Calibration solutions for paper treatment gas measurement, stack emissions and gas detectors used around pulp and paper facilities.

Defined gas specifications

Composition selected for your instrument and method.

Compatible delivery equipment

Cylinders, regulators and gas control for the application.

Application support

Discuss your requirements with the CAC Gas team.

Overview

Start with the measurement you need.

Build the gas supply around each mill instrument. CAC Gas can assist with references and delivery equipment for treatment processes, online analysis and maintenance testing.

Tell us the instrument, gas specification and expected usage. Our team can help identify a suitable reference and gas delivery arrangement for your application.

Applications

Match the reference to the task.

Choose the mixture, concentration and delivery conditions for the specific detector, analyser or method.

01 / APPLICATION

Treatment gas monitoring

Reference options for chlorine and chlorine dioxide instruments used in paper treatment processes.

Cl2 / ClO2
02 / APPLICATION

Emissions & online analysis

Gas standards for stack analysers and selected process measurements.

CEMS / Process gases
03 / APPLICATION

Confined-space instruments

Calibration supply for toxic, combustible and oxygen sensors used by site maintenance teams.

CH4 / H2S / O2 / SO2

Gas & supply options

Define your gas specification.

These examples are a starting point for an enquiry. Exact composition, certification, packaging and current availability are confirmed for the selected product.

Pulp & Paper: reference and supply examples
Reference or supply optionTypical measurement taskWhat to specify
Chlorine referencesTreatment gas detector calibrationSpecify sensor, range and compatible delivery materials.
Chlorine dioxide generationInstrument challenge gas where appropriateDiscuss a suitable gas calibrator for the device.
Stack gas mixturesMill emissions analyser calibrationState each component and required certification.
Multi-gas and single-gas referencesConfined-space and process instrumentsMatch the mixture to the installed sensor set.

Ask about traceable, certified and accredited reference options where required. Accreditation and certificate scope apply to the selected product and producer.

CAC solutions

Specify the complete supply.

Combine the gas reference with suitable handling and delivery equipment.

Make the specification practical.

For reactive gases, include the required flow, tubing arrangement and regulator materials. Discuss gas-generation options when a cylinder reference is unsuitable for the intended challenge gas.

Include your delivery location and required date so cylinder selection, expected use and supply arrangements can be discussed together.

Common questions

Before you specify a gas.

Can chlorine dioxide testing use a gas calibrator?
CAC Gas supplies gas calibrator options for chlorine dioxide applications. Confirm the required concentration, flow and instrument compatibility with the team.
Can I request a custom gas mixture?
Send the required components, concentrations, balance gas and uncertainty or certification requirements. CAC Gas will confirm mixture feasibility, cylinder options, shelf life and lead time with your quotation.
What should I include in my enquiry?
Include the instrument make and model, analytical or test procedure, gas specification, usage, cylinder connection and flow requirements. Add the delivery location and required date so the team can prepare a suitable quotation.

Talk to CAC Gas

Find the right gas for your application.

Send us your instrument and gas requirements. Our team can help define the mixture, cylinder and delivery equipment.

Request a Quote

To help us prepare your quotation

  1. Instrument make, model, sensor or analytical method
  2. Gas components, concentrations and balance gas
  3. Required uncertainty, traceability and certificate scope
  4. Cylinder volume, valve, flow and regulator requirements
  5. Usage, quantity, delivery location and required date
Scroll to Top