CAC Gas & Instrumentation

Steel

Calibration gases for process insight and site monitoring.

Gas standards and delivery equipment for process analysers, stack emissions and safety instruments in steel production facilities.

Defined gas specifications

Composition selected for your instrument and method.

Compatible delivery equipment

Cylinders, regulators and gas control for the application.

Application support

Discuss your requirements with the CAC Gas team.

Overview

Start with the measurement you need.

Different plant areas need different gas references. CAC Gas helps specify mixtures for online analysis and detector testing, with the cylinder and gas control equipment suited to the intended use.

Tell us the instrument, gas specification and expected usage. Our team can help identify a suitable reference and gas delivery arrangement for your application.

Applications

Match the reference to the task.

Choose the mixture, concentration and delivery conditions for the specific detector, analyser or method.

01 / APPLICATION

Process & furnace analysis

Reference mixtures for process instruments, including blast-furnace gas analysis applications.

CO / CO2 / CH4
02 / APPLICATION

Stack emissions monitoring

Gas standards for emissions analysers used around steelmaking operations.

CEMS / SO2
03 / APPLICATION

Plant safety & maintenance

Calibration supply for confined-space detectors and selected toxic gas instruments.

O2 / CO / HCN

Gas & supply options

Define your gas specification.

These examples are a starting point for an enquiry. Exact composition, certification, packaging and current availability are confirmed for the selected product.

Steel: reference and supply examples
Reference or supply optionTypical measurement taskWhat to specify
CO / CO2 / CH4 referencesProcess gas analyser checksProvide the expected composition and analyser range.
Blast-furnace reference mixturesFurnace gas analytical systemsSpecify the complete component list and balance gas.
CEMS gas standardsStack emissions measurementsRequest the concentrations and certification required by the method.
HCN and detector mixturesSpecific toxic gas and confined-space instrumentsConfirm the installed sensor and manufacturer’s test specification.

Ask about traceable, certified and accredited reference options where required. Accreditation and certificate scope apply to the selected product and producer.

CAC solutions

Specify the complete supply.

Combine the gas reference with suitable handling and delivery equipment.

Make the specification practical.

Provide the full analyser or detector specification rather than only the gas name. Process references and personal detector test gases can require very different compositions and delivery conditions.

Include your delivery location and required date so cylinder selection, expected use and supply arrangements can be discussed together.

Common questions

Before you specify a gas.

Can CAC Gas quote a custom furnace gas reference?
Send the target components, concentrations, balance gas and uncertainty requirements. CAC Gas can assess mixture feasibility, packaging and compatible delivery equipment.
Can I request a custom gas mixture?
Send the required components, concentrations, balance gas and uncertainty or certification requirements. CAC Gas will confirm mixture feasibility, cylinder options, shelf life and lead time with your quotation.
What should I include in my enquiry?
Include the instrument make and model, analytical or test procedure, gas specification, usage, cylinder connection and flow requirements. Add the delivery location and required date so the team can prepare a suitable quotation.

Talk to CAC Gas

Find the right gas for your application.

Send us your instrument and gas requirements. Our team can help define the mixture, cylinder and delivery equipment.

Request a Quote

To help us prepare your quotation

  1. Instrument make, model, sensor or analytical method
  2. Gas components, concentrations and balance gas
  3. Required uncertainty, traceability and certificate scope
  4. Cylinder volume, valve, flow and regulator requirements
  5. Usage, quantity, delivery location and required date
Scroll to Top